e26f1d14

4.4.4. Removal and installation of the inlet pipeline and final collector

Details of installation of the inlet pipeline and final collector

1 — the Probe of measurement of level of motive oil
2 — the Basic arm of the fan
3 — EGR Tube
4 — the Termozashchitny screen of a final collector
5 — the Final collector
6 — the Tube of a cooling path / перепускной a branch pipe
7 — the Lifting eye

8 — the Generator
9 — the Basic arm of the generator with an adjusting level
12 — the Rack of the inlet pipeline
13 — Assembly of the inlet pipeline with the air distributor
14 — the Oil filter
15 — the Oil cooler
16 — the oil pressure Sensor


At installation tightening of bolts of fastening of the pipeline has to be made strictly in a certain order.


Order of tightening of bolts of fastening of the inlet pipeline.