e26f1d14

4.5.5. Removal and installation of the inlet pipeline and final collector

Before removal of the inlet pipeline it is necessary to empty the cooling system (see the Head the Current leaving and service).

Details of installation of the inlet pipeline, - the final collector is removed.
Details of installation of a final collector.

At installation of components do not forget to replace sealing laying, track observance of requirements of Specifications of the Head Dvigatel to efforts of tightening of threaded connections.