e26f1d14

5.3.5. Removal and installation of lines of communication of a refrigerator path of the K/V system

 PERFORMANCE ORDER

  1. Prop up wheels antiretractable boots.
  2. By forces of the trained professional make a discharge of a refrigerator path of the К/В system.

Lines of the evaporator

Removal

 PERFORMANCE ORDER

  1. Check components of a cooling path of the engine for existence of signs of development of leaks.
  2. Disconnect and remove the rechargeable battery.
  3. Turn out fixing bolts, disunite sockets of an electrical wiring and connecting hose of the giving pump and remove the tank of liquid of washing of a windshield in a motive compartment (see the Head Kuzov).
  4. Release nipple nuts / bolts since both ends of the line which is subject to removal.
  1. Turn out nuts of fixing collars.
  1. Release the line from intermediate clamps and remove it from the car.

Installation

 PERFORMANCE ORDER

  1. Get the replaceable line on the regular place and latch it in intermediate clamps.
  1. Manually acquire on couple of rounds of a carving both nipple nuts.
  2. Level the line and tighten nipple nuts with the required effort (13 Nanometers and 32 Nanometers).
  3. Screw bolts of fastening of the socket to a partition of a motive compartment and tighten them with the required effort (24 Nanometers).
  4. Screw and tighten a small fixing nut.
  5. By forces of the trained professional make evacuation, vacuum check and charging of a refrigerator path of the К/В system.
  6. Establish and connect the rechargeable battery.
  7. Start the engine, activate To/in and examine nipple sockets of a refrigerator path on existence of signs of development of leaks. In case of need make the corresponding corrections.

Flexible hoses

Removal

 PERFORMANCE ORDER

  1. Release nuts of nipple connections and remove the corresponding hose.

Installation

 PERFORMANCE ORDER

  1. Get a hose on the regular place.
  2. Screw nipple nuts and tighten them with the required effort (depending on a connection point).
  3. By forces of the trained professional make evacuation, vacuum check and charging of a refrigerator path of the К/В system.
  4. Start the engine, activate To/in and examine nipple sockets of a refrigerator path on existence of signs of development of leaks. In case of need make the corresponding corrections.