e26f1d14

5.2.10. Removal and installation of a perepuskny branch pipe of a cooling path of the petrol engine

Details of installation of a perepuskny branch pipe of a heater of a cooling path of the petrol engine

1 — Perepuskna a hose
2 — the Collar
3 — the Clamp
4 — the Returnable branch pipe of a heater
5 — the Sealing ring

6 — Sealing laying of a water intake
7 — Perepuskna a hose
8 — Perepuskna a branch pipe
9 - Collar

Removal

 PERFORMANCE ORDER

  1. Check three nipple sockets of the perepuskny line of a cooling path for existence of signs of development of leaks. In case of need tighten sockets, or replace a branch pipe.
  2. Remove protection of a case.
  3. Uncover a radiator, then open the drain gate and lower cooling liquid in the prepared capacity of suitable volume.
  4. Tighten the gate.
  5. Remove an air inlet of an inlet air path (see Power supply systems, managements of engine/decrease in toxicity of the fulfilled gases and production of the fulfilled gases).
  6. Turn out the top bolts of a basic arm of the inlet pipeline.
  7. Turn out one bolt from an arm on the pipeline.
  8. Remove a wire clamp from an arm behind on the engine, then turn out one bolt and release one clamp.
  9. Disconnect an electrical wiring from the sensor of provision of a butterfly valve (TPS).
  10. Disunite sockets No. No. 1 and 2 of an electrical wiring of the fuel highway.
  11. Turn out one bolt and release one wire clamp at the left in a back part of the power unit.
  12. Disunite sockets of an electrical wiring of two information sensors, release a plait from a basic arm.
  13. Remove the thermofilter of a final collector.
  14. Remove the lower thermofilter.
  15. The car also establish to Poddomkratta it on props.
  16. Turn out bolts of fastening of a reception pipe of system of production of the fulfilled gases.
  17. Turn out a bolt of fastening of a basic arm of a reception pipe.
  18. Remove a starter (see the Head Sistemy of electric equipment of the engine) and take it aside, having provided adequate access to a perepuskny branch pipe.
  19. Release a fixing collar of a returnable hose of a heater.
  20. Turn out a bolt of fastening of a back basic arm of a heating branch pipe on a transmission case.
  21. Disconnect a returnable hose from a branch pipe.
  22. Lower the car on the earth.
  23. Remove a final collector (see Power supply systems, managements of engine/decrease in toxicity of the fulfilled gases and production of the fulfilled gases).
  24. Turn out a bolt of the left forward arm of a branch pipe of a heater.
  25. Disconnect a heater branch pipe from a water intake and remove the heating line assembled.

Installation

 PERFORMANCE ORDER

  1. Establish a new sealing ring on a branch pipe.
  2. Get a branch pipe on the regular place for the engine.
  3. Establish a heating hose.
  4. Connect a branch pipe to a water intake casing.
  5. Screw a bolt of the left forward clamp of a branch pipe.
  6. Establish laying of a final collector.
  7. Screw six bolts of fastening of a final collector and tighten them with the required effort (24 Nanometers).
  8. The car also establish to Poddomkratta it on props.
  9. Connect a reception pipe of system of production of the fulfilled gases to a final collector.
  10. Screw and tighten one bolt of a basic arm of a final path with the required effort (24 Nanometers).
  11. Screw and tighten three nuts of a basic arm of a landing flange of a reception pipe with the required effort (24 Nanometers).
  12. Tighten a collar of fastening of a returnable hose of a heater.
  13. Screw and tighten three bolts of fastening of a starter with the required effort (47 Nanometers).
  14. Fix by two bolts a basic arm of the inlet pipeline.
  15. Screw and tighten with the required effort (22 Nanometers) a bolt of fastening of a basic arm of a branch pipe of a heater on a transmission case.
  16. Lower the car on the earth.
  17. Screw and tighten two bolts of fastening of the inlet pipeline with the required effort (22 Nanometers).
  18. Connect sockets No. No. 1 and 2 of an electrical wiring of the fuel highway.
  19. Connect an electrical wiring to TPS.
  20. Screw and tighten with the required effort (22 Nanometers) in the block of the engine and in the pipeline case two bolts with collars of clamps.
  21. Screw a bolt of fastening of the left back wire clamp. Tighten it with the required effort (22 Nanometers).
  22. Fill an electrical wiring in clamps.
  23. Install the lower thermofilter and fix it by two nuts, having tightened them with the required effort (22 Nanometers).
  24. Install the top thermofilter, - screw and tighten three fixing bolts with the required effort (22 Nanometers).
  25. Connect an electrical wiring to a lambda probe, fix a plait of wires in the holder.
  26. Establish into place an air inlet, connect an electrical wiring to the MAF sensor.
  27. Fill the cooling system.
  28. To Poddomkratta the car, establish it on props and tighten two lower bolts of a basic arm of a starter with the required effort (47 Nanometers).
  29. Lower the car on the earth, start the engine and make sure of lack of signs of development of leak of cooling liquid.