- Disconnect the pressure head line of a hydraulic path from a case of the steering mechanism and connect to it measuring set, - the gate from set has to be connected on the party of the steering mechanism. Nipple connections it is necessary to tighten 31 ÷ 47 Nanometers with effort.
- Perform the pumpings procedure of a hydraulic path (see the Section Removal of Air from a working path of system of hydrostrengthening of a wheel).
- Completely open the gate the gate connected to system, then start the engine and several times turn a steering wheel from an emphasis against the stop for the purpose of warming up of hydraulic liquid up to the normal working temperature (50 ÷ 60 °C).
- Lift engine turns to value 1000 ÷ 1500 in a minute, close the gate and consider the indication of the manometer, - the required value makes 6860 ± 98 kPa (70 ± 1 kgfs/cm2).
- Close the gate and at
-1 engine working with turns of 1000 ÷ 1500 min. turn a steering wheel from an emphasis against the stop, - the indication of the manometer has to remain the same.
|
In order to avoid an overheat of hydraulic liquid do not hold the gate closed more than within 15 seconds! |
- Kill the engine, disconnect the manometer and the gate and restore initial connection of hydraulic lines, having tightened nipple sockets with the required effort (31 ÷ 47 Nanometers).
- In conclusion "pump over" a hydraulic path (see the Section Removal of Air from a working path of system of hydrostrengthening of a wheel).
|
|