6.5.3. Removal and installation of components of system of production of the fulfilled gases

See the prevention at the beginning of the section Check of a Condition of Components of System of Production of the Fulfilled Gases!

Reception pipe with the catalytic converter

 PERFORMANCE ORDER

  1. Release nuts of fastening of reception section to a final collector / turbocompressor.
  2. Give fixing nuts and separate the catalytic converter from connecting section.
  3. Remove assembly of reception section with the catalytic converter and two sealing laying.
  4. Carefully smooth out the interfaced surfaces of connecting flanges, prepare replaceable sealing laying.
  5. Installation is made as it should be, the return to an order of dismantle of components, - track observance of requirements of Specifications of the Head of the Power supply system, management of engine/decrease in toxicity of the fulfilled gases and production of the fulfilled gases to efforts of tightening of carving fixture.

Muffler

 PERFORMANCE ORDER

  1. Release fastening nuts at first of back, then forward connecting flanges of assembly of the muffler with a connecting pipe.
  2. Remove four rubber suspensions from arms and take the muffler from under the car.
FRT — the Direction forward on the car
  1. Remove two sealing laying and carefully smooth out the interfaced surfaces of connecting flanges, - laying is subject to replacement without fail.
  2. Installation is made upside-down, - rubber suspensions before installation should be greased with silicone lubricant, track observance of requirements of Specifications of the Head of the Power supply system, management of engine/decrease in toxicity of the fulfilled gases and production of the fulfilled gases to efforts of tightening of carving fixture.

Exhaust pipe

 PERFORMANCE ORDER

  1. Remove a rubber suspension of an exhaust pipe from a basic arm, then release nuts of a connecting flange.
FRT — the Direction forward on the car
  1. Take a pipe from under the car.
  2. Remove sealing laying.
  3. Installation is made upside-down, do not forget to replace a rubber suspension and to grease it before installation by silicone lubricant, tighten fixing nuts with the required effort.